EMC testing and CE certification readiness. We find the interference problem before the certification body does.

We test emissions and immunity in our engineering laboratory. We design electronics ourselves, so after testing you know:

  • whether the device will pass certification testing,
  • what to change in the design if it does not,
  • what documentation the CE mark requires.

You talk to an EMC engineer, not a salesperson. NDA before the first call on request.

EMC TESTING PATHREV. A · 1:14 DAYS01Your devicePROTOTYPE · SERIES · CHANGE02EMC pre-compliance testingEMISSIONS · IMMUNITYPASS?NODIAGNOSIS + FIXRETESTYES03Technical documentationREPORT · STANDARDS ANALYSIS04Certification bodyCERTIFICATION TESTINGCE mark and the EU marketEU DECLARATION OF CONFORMITY
33+
DEVICES TESTED
1
IN-HOUSE EMC LABORATORY
R&D CENTRE
MINISTRY STATUS SINCE 2024
1
TEAM: TESTING + ELECTRONICS DESIGN
WE HAVE WORKED FOR
Mini Melts
New Form
ClickBox
Lifesaver Ltd
EMKA S.A.
Icevend
Energylandia
HOW WE APPROACH EMC TESTING

EMC testing that tells you what to fix. Not just a pass/fail result.

Electromagnetic compatibility determines whether a device operates safely alongside others and whether it can legally be placed on the EU market. In our engineering laboratory we check both directions: how much interference the device emits and how it copes with interference from its surroundings.

Designing electronics is our day-to-day work. When a measurement exceeds the limit, we look for the cause in the schematic, PCB and firmware, make the changes and verify them with a retest. Then we prepare the documentation and take you through testing at the certification body.

in-house EMC laboratory
cooperation with certification bodies
R&D Centre (Polish Ministry of Development and Technology)
WHEN TO COMMISSION EMC TESTING

When should you do EMC testing? Recognise your situation?

Six moments when clients come to our laboratory.

01

A certification body slot in a few weeks

You want to know whether the device will pass before you pay for the slot and come back with a fail.

02

The device failed EMC testing

You have a report showing exceedances and do not know what to change. We find the cause and confirm the fix by measurement.

03

You are placing a product on the EU market

You need testing, technical documentation and a declaration of conformity. We guide you through the whole process together with the certification body.

04

A change to a finished product

A new power supply, PCB revision, different radio module or a substitute component. We check that the change has not made the results worse.

05

Interference in the field

Resets, dropped communication, false readings near other machines. We reproduce the issue in the laboratory and remove the cause.

06

EMC documentation is incomplete

A device from a supplier or imported, with reports missing. We check what CE requires and complete the testing.

The common denominator: every failed test at a certification body means paying for another slot and a delayed launch. Pre-compliance testing tells you earlier whether you are ready.

SCOPE OF TESTING

EMC emissions and immunity testing. Two sides of the same compliance.

We check that the device does not disturb its surroundings and that it works correctly when those surroundings disturb it.

EMISSIONS

Does the device disturb its surroundings?

EMISSION SPECTRUM · dBµVLIMIT30 MHz[1 GHz]
Conducted emissionsinterference fed back into the mains and cables
EN 55011 · 55014-1 · 55032
Radiated emissionselectromagnetic field emitted by the device
EN 55011 · 55014-1 · 55032
Harmonics and voltage fluctuationsthe device’s impact on mains power quality
EN 61000-3-2 · 3-3
IMMUNITY

Does the device work despite interference?

TEST WAVEFORMSESDEFT / BURSTSURGE
Electrostatic discharge (ESD)touch, operation, assembly
EN 61000-4-2
RF electromagnetic fieldradios, phones, transmitters nearby
EN 61000-4-3
Electrical fast transients (EFT/burst)load switching on the mains
EN 61000-4-4
Surgeslightning, switching on the mains
EN 61000-4-5
Conducted RF disturbancesinterference coupled in through cables
EN 61000-4-6
Voltage dips and interruptionsunstable power supply
EN 61000-4-11
PRODUCT AND GENERIC STANDARDS
EN IEC 61000-6-1 / -6-2
EN IEC 61000-6-3 / -6-4
EN 55032 / 55035
EN 61326-1
EN 60601-1-2
[scope of testing in our laboratory to be confirmed against equipment]
OUR WORK · EMC

EMC testing in real projects. What failed and what we changed.

All projects
RADIATED EMISSIONS · BEFORE / AFTERBEFORE: [X] dB ABOVE LIMIT[FREQUENCY]
[INDUSTRY] · [COUNTRY]

[Client / device]

[Problem: e.g. radiated emissions exceeded. The cause we found and the design change.]

[result: 1 hard number]
IMMUNITY · ESDDISCHARGE POINTS: [X]HMI PANEL
[INDUSTRY] · [COUNTRY]

[Client / device]

[Problem: e.g. controller resets during ESD discharges on the panel. Cause and fix.]

[result]
PATH TO CE · [DEVICE]INPUT FILTERFERRITE
[INDUSTRY] · [COUNTRY]

[Client / device]

[Full path: selection of standards, pre-compliance testing, fixes, documentation and testing at the certification body.]

[result]
[CLIENT] · [COUNTRY]

“[Client quote on EMC testing: what they gained, e.g. time saved or an avoided second certification body slot.]”

[Full name, position, company]
[30–60 s video from the EMC laboratory · thumbnail with play button]
PACKAGES AND PRICES

EMC testing: packages and prices. Compare and choose.

We describe every package using the same parameters, so you can see straight away which one fits your situation.

PRE-COMPLIANCE TESTING

EMC pre-compliance

When
Before your certification body slot or after a design change.
Answers
Will the device pass certification testing?
Scope
Emissions and immunity measurements to standards selected for the product. A report with results and a list of risks.
Time
4 days in the laboratory · report within 14 days of receiving the device
PRICEfrom EUR 2,000 net / laboratory day
MOST POPULAR

EMC diagnosis and fixes

When
The device failed testing or suffers interference in the field.
Answers
What needs to change for the device to pass?
Scope
Locating interference sources, changes to PCB, filtering, shielding and firmware, retest in the laboratory.
Time
[X–Y] weeks
PRICEquoted after pre-compliance testingDepends on the number of non-conformities and whether the changes require a new PCB revision.
PATH TO CE

From testing to the declaration of conformity

When
You are placing a product on the EU market and want one partner for the whole process.
Answers
What does it take to put the CE mark on a product?
Scope
Selection of directives and standards, pre-compliance testing, fixes, technical documentation, testing at the certification body, support with the declaration of conformity.
Time
depending on scope
PRICEquoted on scope[certification body fees included / separate - to be confirmed]
IN EVERY PACKAGE
NDA before the first call
report with measurements and photos of the test set-up
results for your technical documentation
white label
PROCESS · 5 STAGES

EMC testing process in 5 stages. Fixes before your certification body slot, not after it.

We skip stage 3 if the device passes first time. You only pay for fixes when they are needed.

01Selection of standards
STAGE 01 / 05

Selection of standards

We establish which directives and standards apply to your product and what we test first.

OUTPUT: test plan
STAGE 02 / 05

Pre-compliance testing

Emissions and immunity in our engineering laboratory, across the device’s operating modes.

OUTPUT: report with results
STAGE 03 / 05

Diagnosis and fixes

We find the source of the problem and change the design: PCB, filters, shielding, firmware.

OUTPUT: device after fixes
STAGE 04 / 05

Retest and documentation

We confirm the fixes by measurement and compile the technical documentation.

OUTPUT: complete certification package
STAGE 05 / 05

Certification body and CE mark

We arrange testing at the certification body and take you through the whole process.

CE mark
OUTPUTS

What you get from EMC testing.

Results you can show the certification body, your own team or your electronics supplier.

Reports and measurement results belong to you
emissions and immunity measurement report
description and photos of the test set-up
list of non-conformities with their causes
recommended design changes
revised schematics, PCB and BOM
device ready for certification
technical documentation for CE
support with the EU declaration of conformity
TEAM

The engineers who will test your device.

Testing is led by an EMC engineer. An electronics designer joins for the fixes. The same team from measurement to retest.

[PHOTO · EMC LAB]
Piotr PolichtEMC engineerMEASUREMENTS · STANDARDS · [X] YEARS
[PHOTO · AT THE TEST BENCH]
[Full name]Electronics designerPCB · FILTERING · SHIELDING
[PHOTO · DEBUG]
[Full name]FirmwareEMBEDDED · IMMUNITY
CHECKLIST · PDF · [X] PP.12 things to check before EMC testing
NOT READY FOR A CALL YET?

Checklist: 12 things to check before EMC testing

Power supply, cables, earthing, enclosure, operating modes for the test. Check whether the device is ready before you book a slot. [WORKING TITLE]

FAQ

EMC testing and CE certification: frequently asked questions.

Your question is not here? Ask it in the form and an EMC engineer will answer.

Do you issue a CE certificate?

The manufacturer affixes the CE mark on the basis of the EU declaration of conformity. For most devices covered by the EMC Directive there is no single “CE certificate”: there is testing to harmonised standards, technical documentation and the declaration. We prepare you for each of these, and carry out certification testing together with the certification body we work with.

How does pre-compliance testing differ from testing at a certification body?

We carry out pre-compliance testing in our engineering laboratory to check whether the device will pass and where the risks are. Certification testing takes place at the certification body. Thanks to pre-compliance testing you go there with a device that passes, instead of paying for repeat slots.

How much does EMC testing cost?

Pre-compliance testing costs from EUR 2,000 net per laboratory day. The price depends on the number of standards, operating modes and the size of the device. We quote for fixes after pre-compliance testing, once we know what fails.

How long does EMC testing take?

It takes 14 days from receiving the device to the report, of which 4 days are testing in the laboratory. You receive the report 3 days after testing ends. We book the certification body slot once the device is ready.

What if the device fails?

We show which measurements exceed the limits and why, propose changes and run a retest. We design electronics ourselves, so the fixes can be made by the same team.

Do you test devices you did not design?

Yes. The design does not have to come from us. If fixes are needed, we make them ourselves or pass recommendations to your team or supplier.

Which standards do you test to?

[list of standards to be confirmed against laboratory equipment]. On the first call we establish which directives and standards apply to your product.

What should I prepare for testing?

[X] units of the device, power supply and cables, a description of the operating modes and the software that runs them. You will receive the full list before the test date.

Will you sign an NDA before the first call?

Yes. You can send your own template or use ours.

Do you work with companies outside Poland?

Yes, including clients from the United Kingdom. We communicate in English. [reports in English - to be confirmed]
TALK ABOUT TESTING

Tell us about your device.

An EMC engineer replies within 1 working day. The first call takes 30 minutes and is non-binding.

WHAT HAPPENS NEXT
130-min call and selection of standards
2NDA and device description
3Quotation and laboratory slot within 10 working days
STEP 1 OF 2approx. 1 minute
RELATED SERVICES

What if the design needs to change?

All services
RESEARCH & DEVELOPMENT

R&D

When an EMC problem requires a change of architecture or a new technical solution.

FROM THE START

Product Development

Electronics designed from the first schematic with EMC and certification in mind.

EXA-MAKE

Electronics manufacturing

Series production on the SMT/THT line once the device has passed testing.